We have been very happy with the way the tiling (the biggest part of this remodel) has gone. The bathrooms have turned out very nice.
Here is the master bath...
And the guest bath...
Tuesday, May 19, 2009
House #3 - The Fireplace
I have been extremely happy with the way the fireplace turned out on this house. Here is the before picture...
One of the guys putting the finishing touches...
And the final product...
I still need to clean out the trash that has gotten in there through out the remodel though!
One of the guys putting the finishing touches...
And the final product...
I still need to clean out the trash that has gotten in there through out the remodel though!
House #3 - It finally passed!!!
We finally received the green tag to move forward with the shower in the master bath!! We received the first red tag because they issued the permit for the wrong address. And because Justin's license doesn't match the address of the house he couldn't get a homeowner's permit even though he owns the house! Can someone please explain that to me? Therefore we had to pay someone to claim the work that Justin had already done.
Sunday, May 10, 2009
House #3 - Coming Along
Our third house is coming right along. At this point the painting has started and is just about done. The tile is currently going in. As you can see we took at the wall inbetween the family room at the dinning room. You probably can't tell from the pictures but the layout of this house is the exact same as the house on Burlinghall.
Paint as been completed.....well except for the baseboards. So the lights are starting to be installed.
This was a big delima.......what to do about the fireplace. When I first bought the house I was orignally planning on taking it out but then after removing the sheetrock and taking a better look at it, figured it can stay......Might have just been the cheap side of me coming into play but after it is covered in Travertine it should look pretty good.
It took a little long to finish the kitchen than I had planned.....probably because everytime I was off I kept getting called into work. I desided to move around the appliances in order to give it an open feel to the family room. The range used to be on the right and now will be in the cutout of the cabinets and the fridge will be on the right.
Paint as been completed.....well except for the baseboards. So the lights are starting to be installed.
This was a big delima.......what to do about the fireplace. When I first bought the house I was orignally planning on taking it out but then after removing the sheetrock and taking a better look at it, figured it can stay......Might have just been the cheap side of me coming into play but after it is covered in Travertine it should look pretty good.
It took a little long to finish the kitchen than I had planned.....probably because everytime I was off I kept getting called into work. I desided to move around the appliances in order to give it an open feel to the family room. The range used to be on the right and now will be in the cutout of the cabinets and the fridge will be on the right.
There used to be a makeup nook but that has been taken out to make room for a larger shower....
That is currently being held up because of the city's inability to issue a permit to the correct address. Government is great!!!
Subscribe to: